Physical Audit

2020 New Equation Explainaion

Antenna Support (Sample)

Checklist Before

Phase Two References

PQA CRs List V1.4 (For SRS Updates)

SRS-DLB-PhysicalAudit – Phase two V1.0

Physical Audit reports:

AC Fail Report-minimized to 20 cases per vendor- Sept 19

A-Cs Fail Report Table minimized to 20 cases per vendor – Month September 2019

Monthly Audit Report_September 2019

NUWEIBAA 3 BSC_C1_0062SI_PH2_2_General_324773_2019-Oct-11

Physical Quality New Dashboard W38- without pics

Power Meter Readings and Status- Sept 2019

Quality Assurance Monthly Report_September 19

Stealth- sabotage- Sept 19

Visits Achievement

1 month back(CA-AL-DE-RE)

AC control board- Sept 19